The IFF OBA team, in cooperation with the representatives from Ministry of Water (MoW) and the Ministry of Finance (MOF), carried out a project verification visit to the Mtwara WSSA from 25.03.2024 to 28.03.2024.
The visit aimed at the verification of output targets, which include (i) Installation of water supply distribu-tion pipeline 32.3km, installation of two multistage pumps Q=200m3/hr with 120m Head for Mtawanya; (ii) Connection of 800Nr.metered new customers and 4Nr.water kiosks constructed and operational; (iii) Replacement of at least 700Nr faulty meters; (iv) Collection efficiency of not less than 90% within the entire service area of Mtwara WSSA.