INTERIM VISIT TO TUWASA AND MUWSA

24. May 2018

From 18th April 2018 – 20th April 2018 and from 14th May 2018 – 16th May 2018, the IFF Consultant conducted an interim visit to Tabora Urban Water and Sewerage Authority (TUWASA) and Moshi Urban Water and Sewerage Authority (MUWSA), respectively. The aim of the visits was to assess the documentation of financial expenditure and to clarify some inconsistencies that occurred in the interim report.

The interim project visit and the Consultants’ recommendations will assist the utility in streamlining the reporting and documentation of expenditure. This, in turn, will benefit the final project verification that is required for the approval of the grant disbursement.

Overflow of Igombe Dam in Tabora.

Constructed Mang'ana intake in Moshi.