TANGA UWASA

The Tanga Water Supply Improvement Project aims at increasing the quantity of water supplied to the existing network and to a newly served area. Basically the whole project comprises three main components.
1.    Drilling of two new boreholes, construction of the pump house and raising main (DN 150 PVC pipe) from Mwakileo Borehole site to Nguvu mali tanks about 2.5 Km
2.    Construction of gravity main (DN 200, PVC pipe) from MOWE to Mbogo (cross  -Z) Area about 7.11 Km from water treatment plant.
3.    Extension of Water supply network to uncovered areas of the city by 9.1KM.


 The main figure of the Project are summarised below: