Iringa Extension of Water Distribution Network

The Iringa Water Supply and Sanitation Authority is implementing the project Extension of Water Distribution Network Project to Peri-Urban Areas within Iringa Municipality. The project involves the following activities:
•    Provision of water supply network to various areas (83.77 km)
•    Connection of 2,000 customers
•    Construction of (6) water kiosks

Morogoro Water Supply Services

The MOROGORO Water Supply and Sanitation Authority is implementing the IFF-OBA project Improvement of Water Supply Services within Morogoro Municipality. The project involves the following activities;
•    Construction of two intakes, sedimentation tanks and one storage tank
•    Construction of transmission and distribution mains
•    Construction of water kiosks
•    Connection of new customers

Singida Water Supply Improvement Works


The Singida Water Supply and sanitation Authority is implementing IFF-OBA project Extension of Distribution Network and Water Supply Improvement Works in Singida Town. The project involves the following activities:
•    Water network extension to the un-served areas in both, Karakana Upper and Lower areas within Singida Municipality
•    Equipping the existing drilled / tested/ Namfua borehole (potential yield of 31.8 m3/hr) to boost supply to the proposed Karakana- Lower Zone areas
•    Provision for complete replacement of the surface pump set / controls at the Kititimo booster pump house and construction of a new storage tank of 200 m3 to serve the poten-tial customers in Karakana- Upper zone areas
•    Procurement and installation of 500 Nr. water meters for 500 new domestic consumers.
•    Connection of new customers 

Shinyanga WSSAs

The Shinyanga Water Supply and Sanitation Authority (SHUWASA) is implementing IFF-OBA project Water Supply Network Extension and Replacement of Water Meters within Shinyanga Municipality The project involves the following activities;
•    Construction of 17km new distribution pipelines ranging from 90 – 110mm for un- served areas of Busongo/Kitangili ,Ndembezi,Butengwa and Masekelo.
•    Extension of distribution network
•    Connection of 1,000Nr new customers
•    Replacement of 4,000Nr faulty water meters and installation of 500Nr pre-paid water meters
•    Construction of 6Nr domestic points (water kiosks) for low-income group in the cited areas